Menu
Website Logo Cardiff Transport Preservation Group
  • Home
  • Latest News
    • Latest News
    • Engineers Corner
    • Past Events
    • Future Events
    • Newsletters
  • Group
    • Origin
    • Group Aims
    • Become a Member
    • Wanted / For Sale
  • Depot
    • Group Vehicles
    • Members Vehicles
    • Depot History
  • Volunteer
  • Contact Us
  • FAQs
  • Links
Cardiff Transport Preservation Group
Everything rady to go back in

Compressor Work

Posted on September 21, 2017July 15, 2019 by LeylandLynx


Having got the right parts, Bob and Mike set about reassembling the compressor and fitting it back into 258. Below is a photo of all the parts on the table prior to being put back into the vehicle. The pink gasket near the camera was the gasket we had trouble sourcing.

Everything ready to go back in
Everything ready to go back in

Below is a photo of the area of the engine that the compressor was put back in. As you can see there really not much space to get to it. At part during the refitting Bob was inside and Mike was behind the vehicle trying to get the best access to it.

And a photo of half of the compressor attached back into the engine.

Search

Become A Member

Join Us
Photo of Bustlers lined up outside barry depot

Find Us

More Info

View Larger Map

Opening Times

Day Times
Monday Closed
Tuesday Closed
Wednesday Closed
Thursday Closed
Friday 10am - 4pm
Saturday 10am - 4pm
Sunday Closed
©2025 Cardiff Transport Preservation Group | Powered by WordPress & Superb Themes