Menu
Website Logo Cardiff Transport Preservation Group
  • Home
  • Latest News
    • Latest News
    • Engineers Corner
    • Past Events
    • Future Events
    • Newsletters
  • Group
    • Origin
    • Group Aims
    • Become a Member
    • Wanted / For Sale
  • Depot
    • Group Vehicles
    • Members Vehicles
    • Depot History
  • Volunteer
  • Contact Us
  • FAQs
  • Links
Cardiff Transport Preservation Group
The new cable

Work on the Metrorider Throttle Pedal

Posted on June 14, 2017July 15, 2019 by LeylandLynx

We recently bought the Metrorider up from the docks storage for a pre MOT check and to sort out a throttle related issue. We renewed the throttle pedal assembly and replaced the throttle and cable. The fuel pump leaver was found to be fitted incorrectly this has now been re positioned and the kick down was now found to be operating correctly. The vehicle has had a check over and service and has successfully passed it’s MOT (June 2017).

The new cable
The new cable
The new cable
The new cable
The new pedal in position
The new pedal in position

Search

Become A Member

Join Us
Photo of Bustlers lined up outside barry depot

Find Us

More Info

View Larger Map

Opening Times

Day Times
Monday Closed
Tuesday Closed
Wednesday Closed
Thursday Closed
Friday 10am - 4pm
Saturday 10am - 4pm
Sunday Closed
©2025 Cardiff Transport Preservation Group | Powered by WordPress & Superb Themes